All resources

Case study

Data Centre Management System

Power, cooling, UPS and PUE from the rack inlet up to the site meter, costed at your own tariff.

Download PDF
Type
Case study
Product
MACHHUB platform
Format
PDF
Size
1.0 MB
Pages
2
Updated
7 September 2026
Language
English

Inside the system

Screens from the running application, built on MACHHUB.

An isometric floor plan of a data centre with live load and temperature on each rack
The floor as it stands: every rack, CRAC unit and UPS, with its live reading.
The facility overview, with PUE, load split and rack inlet temperatures
PUE against the baseline, the load split, and the inlet temperature of every rack.
Thirty days of PUE, daily energy and cost, and the worst hour of the day
Thirty days of efficiency, costed at the site tariff, down to the worst hour of the day.
The alert register, showing active and cleared alerts with acknowledgement times
What was raised, who answered it, and how long it took.